TRAFALGAR – B-Wing, Crane Work on Sept. 14th
September 9, 2024
Crane Work at Trafalgar B-Wing
- On September 14th, a crane will be set up between B-wing and C-wing to remove a temporary AC unit. The operation is scheduled to begin early in the morning and is expected to be completed by the afternoon. During this time, there may be limited access to certain pedestrian paths near B-wing, C-wing, and the Student Centre along the creek. Signage and barriers will be in place to guide pedestrians safely around the work area and provide additional communication for alternative pathways.
- For safety, the crane’s path will be clearly marked with caution tape and positioned at a safe distance from the building to keep all emergency exits clear.
- A map including the work area, and alternative accessible routes is included below
construction notice _Map_Crane Work
For more information, please contact any of the following:
facilities@sheridancollege.ca,
SMD&C team:
Munzarin Morshed- munzarin.morshed@sheridancollege.ca
Nathan Case – nathan.case@sheridancollege.ca,
Lorie Banhaon – lorie.banhaon@sheridancollege.ca
Thank you for your attention to this matter.