DAVIS – Road Resurfacing Work – Temporary Bus Detour (July 27–31)
July 21, 2026
Road resurfacing work will take place on campus roads from July 27–31, affecting several areas including Sheridan College Drive, the roundabout, and the B2 loading dock area.
During this time, campus bus access will be temporarily impacted. MiWay has been notified and a detour route will be in effect. Vehicle access and parking will remain available, but delays should be expected.
Please see the attached map for affected areas. Thank you for your patience and cooperation.
aerial 2026 paving zones davis
Facilities & Sustainable Infrastructure