C-Wing Railing Installation, TRAF
April 5, 2019
Reason: Installation of Health and Safety guardrail on the roof
Location: Trafalgar C-Wing first floor inside the Learning Commons
Duration: Anticipated for 7:00am to 9:30am
April 5, 2019
Reason: Installation of Health and Safety guardrail on the roof
Location: Trafalgar C-Wing first floor inside the Learning Commons
Duration: Anticipated for 7:00am to 9:30am